Lifetime Warranty-70% less labor

How simple is the GLTI PLug and Play? Working with the new GLTI ProStaff team at PLANTZ in the Tampa Florida this time-lapse video demonstrates the installation of the GLTI Plug and Play. Each panel has only 2 pieces of hardware.

  • Unlike the plastic competitor, the GLTI Plug and Play does NOT require manually assembled drains for each row.
  • This GLTI Plug and Play ONLY required 22 pieces of hardware!
  • The competition would have required 144 pieces.
  • The GLTI Plug and Play does not require vapor barrier because our – Pat Technology has airflow behind the wall!
  • The competitor mounts directly to the wall with NO space between the wall and the plastic tray, this means 144 holes in the vapor barrier. Why bother having a vapor barrier!

With calculated irrigation use, the GLTI does not require a reservoir subject to disease and pathogens, NO pumps, NO plastic, No worries! GLTI Plug and Play come with a lifetime warranty!

 

 

a